ISO.3.2.1 Allocation of V-Model Activities to Primary Processes  

  ISO.3.2.1 Zuordnung von Aktivitšten des V-Modells zu den Primary Processes

The processes Acquisition and Supply can only partially be covered by the V-Model.

The process Development can be completely realized with the V-Model. The development process of the ISO 12207, however, does not only refer to the software development activities of the V-Model but also to quality assurance, and, in part, to PM and CM activities. The ISO 12207 tasks also include review tasks during the development process of software development activities. Though the ISO 12207 standard defines independent quality assurance processes (see "Supporting Processes"), they are not referred to at this point. Therefore, the development process includes submodel SD (with the exception of the hardware) and also parts of submodel QA of the V-Model.

Process Maintenance is covered in the V-Model only with regard to general software maintenance and modification activities. The V-Model does not cover the aspect "Software Retirement".

Since the V-Model is a development standard, process Operation has not been regulated. Some QA, CM, and PM activities, however, may well be applied to process operation. Acquisition Process

Acquisition Process
Activities according to ISO 12207 Activities according to the V-Model
Initiation SD1.1 - Recording of Actual Status and Analysis
SD1.2 - Description of Application System
SD1.3 - Definition of Criticality and Quality Requirements
SD1.4 - Definition of Marginal Conditions
SD1.5 - User-Level System Structure
SD2.3 - Investigation of Feasibility
PM1.1 - Setting up the Project
PM1.2 - Definition of Project Criteria and Development Strategy
Request-for-Proposal Preparation PM1.3 - Generation of Project-Specific V-Model
PM2 - Placement/ Procurement
Contract Preparation and Update PM2 - Placement/ Procurement
CM3 - Change Management (Configuration Control)
Supplier Monitoring PM3 - Contractor Management
PM6 - Phase Review
Acceptance and Completion -

Table ISO.3: Allocation of Acquisition Process to V-Model Activities

Supply Process
Activities according to ISO 12207 Activities according to the V-Model
Initiation -
Preparation of Response PM1.3 - Generation of Project-Specific V-Model
Contract -
Planning PM1.4 - Toolset Management
PM1.5 - Generation of Preliminary Plan
QA1 - QA Initialization
Execution and Control PM3 - Contractor Management
PM4 - Detailed Planning
PM7 - Risk Management
PM8 - Project Control
PM9 - Information Service/Reporting
Review and Evaluation PM6 - Phase Review
QA4 - Product Assessment
QA5 - QA Reporting
Delivery and Completion PM14 - Project Completion

Table ISO.4: Allocation of Supply Process to V-Model Activities

Development Process
Activities according to ISO 12207 Activities according to the V-Model
Process Implementation PM1.3 - Generation of Project-Specific V-Model
PM1.5 - Generation of Preliminary Plan
PM1.4 - Toolset Management
PM4 - Detailed Planning
System Requirements Analysis SD1.2 - Description of Application System
SD1.5 - User-Level System Structure
QA4 - Product Assessment
System Architectural Design SD2.1 - Technical System Design
SD2.4 - Allocation of User Requirements
SD2.5 - Interface Description
SD2.3 - Investigation of Feasibility
QA4 - Product Assessment
Software Requirements Analysis SD3 - SW/HW Requirements Analysis
QA4 - Product Assessment
PM6 - Phase Review
Software Architectural Design SD4.1 - SW Architecture Design
SD4.2 - Design of Internal and External SW Interfaces
QA2.1 - Definition of Assessment Methods and Criteria
QA4 - Product Assessment
PM6 - Phase Review
Software Detailed Design SD5.1 - Description of SW Component/Module/DatabaseQA1.2 - Generation the Assessment Plan
QA2.1 - Definition of Assessment Methods and Criteria
QA4 - Product Assessment
PM6 - Phase Review
Software Coding and Testing SD6.1 - Coding of SW Modules
SD6.2 - Realization of Database
QA2.3 - Definition of Test Cases
QA2.4 - Generation of Assessment Procedure
SD6.3 - Self-Assesment of the SW Module/Database
QA4 - Product Assessment
Software Integration SD4.3 - Specification of SW Integration
SD7 - SW Integration
QA2.3 - Definition of Test Cases
QA2.4 - Generation of Assessment Procedure
QA4 - Product Assessment
PM6 - Phase Review
Software Qualification Testing QA4 - Product Assessment
CM2 - Product and Configuration Management
CM4.4 - Data Backup
PM6 - Phase Review
System Integration SD8 - System Integration
QA2.3 - Definition of Test Cases
QA2.4 - Generation of Assessment Procedure
QA4 - Product Assessment
System Qualification Testing QA4 - Product Assessment
CM2 - Product and Configuration Management
CM4.4 - Data Backup
PM6 - Phase Review
Software Installation SD9 - Transition to Utilization
Software Acceptance Support SD9 - Transition to Utilization
PM6 - Phase Review

Table ISO.5: Allocation of Development Process to V-Model Activities

Operation Process
Activities according to ISO 12207 Activities according to the V-Model
Process Implementation QA1.1 - Generation the QA Plan
CM3 - Change Management (Configuration Control)
Operational Testing QA4 - Product Assessment
System Operation -
User Support -

Table ISO.6: Allocation of Operation Process to V-Model Activities

Maintenance Process
Activities according to ISO 12207 Activities according to the V-Model
Process Implementation SD1.8 - Generation of Software Maintenance and Modification Concept
CM3 - Change Management (Configuration Control)
Problem and Modification Analysis CM3.1 - Change Evaluation
Modification Implementation CM3.2 - Decision about Change Procedures and Initiation of Change
Maintenance Review / Acceptance CM3.3 - Completion of Change
QA4 - Product Assessment
Migration -
Software Retirement -

Table ISO.7: Allocation of Maintenance Process to V-Model Activities