CM 4.4: Data Backup  

  KM4.4 - Ergebnisse sichern

Contents  
  • Product Flow
  • Handling
  • Roles
  •  
  • Tools Requirements
  • External Norms
  • Product Flow

    From Product to Methods Tool Req. Ext. Norms
    Activity State Chapter Title Activity State
    PM1 or
    PM4
    being proc. Existing Project Plan - -     /ISO IEC 12207/

    Devlp. Proc.:
    SW Qualif. Testing,
    Sys. Qualif. Testing,

    CM Proc.:
    Config. Evaluation

    CM1 accepted All CM Plan - -    
    External - All Product Library - -    

    + "Chapter" are extra columns from the original printed version of GD 250

    Further Results:
    Relevant section of the product library saved on data media and stored safely
    If necessary, samples and prototypes of HW products

    Handling

    Activity CM 4.4 "Data Backup" is realized on the basis of project requirements at different deadlines/intervals and to the individually required extent:

    Roles

    Role Participation
    CM Administrator responsible

    Tools Requirements

    Being defined

    External Norms

    Norm Process Chapter Obs.
    /ISO IEC 12207/ Development Process Software Qualification Testing (s. Part 3 - ISO 3.2.1)
    System Qualification Testing
    Configuration Management Process Configuration Evaluation (s. Part 3 - ISO 3.2.2)