PM 2: Placement/Procurement  

  PM2 - Vergabe/Beschaffung

Contents  
  • Product Flow
  • Handling
  • Roles
  • Methods
  •  
  • Tools Requirements
  • External Norms
  • Links to the V-Model Mailinglist
  • Product Flow

    From Product to Methods Tool Req. Ext. Norms
    Activity State Chapter Title Activity State
    PM1 accepted All Project Manual External(2) -     /ISO IEC 12207/

    Acquis. Proc.:
    Req. Proposal Prep.,

    Contract Prep. and Upd.

    - - All Tender Documents(1) External submitted    
    PM6 - All Report Documents:
    Protocol
    Progress Report
    Final Project Report
    Case Report
    Memo
    Internal Message
    Invitation
    - -    
    External - All Offer (1) - -    
    - - All Offer Evaluation PM6 submitted BA  
    - - All Contract (3) PM3
    External
    -    

    + "Chapter" are extra columns from the original printed version of GD 250

    Handling

    The activity's goal is to determine the most economic offer for a performance that will be externally placed by the conclusion of a contract. The corresponding placement right is the essential marginal condition.

    This activity must be realized whenever performances are to be placed externally or when procurements are required (e. g. of off-the-shelf-products).

    The activity is comprised of the individual aspects

    Roles

    Role Participation
    Project Manager advising
    Project Leader responsible
    Legal Representative cooperating
    Project Administrator cooperating

    Methods

    Product Methods Allocation Use
    Offer Evaluation.
    Evaluation of the Offers
    BA - Benefit Analysis Generate

    Tools Requirements

    Being defined

    External Norms

    Norm Process Chapter Obs.
    /ISO IEC 12207/ Acquisition Process Initiation and Scope Definition (s. Part 3 - ISO 3.2.1)
    Contract Preparation and Update

    Links to the V-Model Mailinglist

    Mail 0505 - Arbeitsauftrag (505)
    Mail 0418 - Verzahnung PM, SE - AG, AN (420)
    Mail 0240 - Re: PM Auftragnehmer (240)
    Mail 0235 - PM Auftragnehmer (235)


    Notes:

    (1) The form has not been regulated in the V-model (see Part 2 "Supplements with Regard to Authorities").

    (2) In the case of a procurement, the Project Manual is not made available externally.

    (3) Contracts are concluded in the Federal Administration, normally based on the "Supplemental Contract Regulations for the Procurement of IT Services" (EVB-IT). This refers to contract type EVB-IT-Generation which supports the setting up of contracts on the basis of the V-Model.