SD 5.2-SW: Analysis of Resources and Time Requirements  

  SD5.2-SW - Betriebsmittel- und Zeitbedarf analysieren

Contents  
  • Product Flow
  • Handling
  • Roles
  • Methods
  •  
  • Tools Requirements
  • External Norms
  • Links to the V-Model Mailinglist
  • Product Flow

    From Product to Methods Tool Req. Ext. Norms
    Activity State Chapter Title Activity State
    SD1 accepted All User Requirements - -      
    SD3 accepted All Technical Requirements - -    
    SD4-SW accepted All Software Architecture - -    
    SD4-SW accepted All Interface Overview - -    
    SD4-SW accepted All Interface Description - -    
    SD5.1-SW accepted All Data-Dictionary - -    
    SD5.1-SW being proc. Existing SW Design (Module)
    SW Design (Database)
    - -    
    - - 3 SW Design (Module).
    Characteristic Quantities
    ,

    SW Design (Database).
    Characteristic Quantities

    SD6-SW submitted ACC (1)
    SIMU (2)
    SSD18
    SSD19
    SSD31

    + "Chapter" are extra columns from the original printed version of GD 250

    Handling

    This is where the calculated requirements are investigated and assessed with regard to their feasibility. Based on the Software Architecture and the description of the SW Component/SW Module and Database, the required resources and the required time have to be investigated. With regard to the characteristics of the SW Unit defined in the Technical Requirements, the discovered performance characteristics should have sufficient possibilities left to realize the maintenance and modification measures without redesign at some later time. If these possibilities are not given the realization decisions have to be exactly assessed at this point.

    Roles

    Role Participation
    SW Developer responsible

    Methods

    Product Methods Allocation Use
    Chapter 3
    SW Design (Module).
    Characteristic Quantities
    ACC - Analysis of Covert Channels (1) Generate
    SIMU - Simulation Models (2) Generate
    Chapter 3
    SW Design (Database).
    Characteristic Quantities
    ACC - Analysis of Covert Channels (1) Generate
    SIMU - Simulation Models (2) Generate

    Tools Requirements

    Product Functional Tools Requirements
    Chapter 3
    SW Design (Module).
    Characteristic Quantities
    SSD18 - Estimating Performances
    SSD19 - Simulating Timing Behavior
    SSD31 - Analysis of Covert Channels
    Chapter 3
    SW Design (Database).
    Characteristic Quantities
    SSD18 - Estimating Performances
    SSD19 - Simulating Timing Behavior
    SSD31 - Analysis of Covert Channels

    External Norms

    Being defined


    Notes:

    (1) Method ACC must be applied according to [ITSEC].

    (2) Method SIMU is to be applied if reliability requirements are high nd the use conditions are so complex that static investigations with regard to feasibility and resource requirements are not sufficient.