SD 8.1: Integration into System  

  SE8.1 - Zum System integrieren

Contents  
  • Product Flow
  • Handling
  • Roles
  •  
  • Tools Requirements
  • External Norms
  • Product Flow

    From Product to Methods Tool Req. Ext. Norms
    Activity State Chapter Title Activity State
    SD7-SW accepted All Implementation Document: SW Unit - -      
    - SW Unit    
    SD7-HW accepted All HW Unit - -    
    External - All Non-IT Portions - -    
    SD4-SW accepted AllIntegration Plan - -    
    - - All System SD8.2 being proc.   SSD16

    + "Chapter" are extra columns from the original printed version of GD 250

    Handling

    In this activity, SW Unit, HW Unit and possibly non-IT portions are integrated into the System. The procedure must adhere to the Integration Plan which describes all of the integration measures to be realized.

    Under certain conditions, the specified architecture elements are first integrated into Segments. In case Segments are planned, the self-Assessments have to include Segments as well.

    In case self-assessments (SD8.2 - Self-Assessment of the System ) are required even though not all elements are available for the integration, the missing elements must be replaced by Dummies.

    Roles

    Role Participation
    System Analyst advising
    System Designer responsible
    SW Developer cooperating
    HW Developer cooperating

    Tools Requirements

    Product Functional Tools Requirements
    System SSD16 - Linking

    External Norms

    Being defined